久久不精品亚洲无码视频,久久国产乱子伦精品免费午夜,亚洲精品一线在线观看,天堂无码人妻中文字幕

 
寧波旭越新材料科技有限公司

Company News

Ningbo Xuyue New Material Technology Co., LTD. Wanyang Zhongchuang City phase II

發(fā)布時(shí)間:2024-03-26 13:27:23  點(diǎn)擊量:285

According to the relevant provisions of the construction project completion environmental acceptance procedure, Ningbo Xuyue New Materials Technology Co., LTD. Wanyang Zhongchuang City Phase II "Green Island" project (phase 1) completion environmental protection acceptance is publicized as follows:

Project Name: "Green Island" Project of the second phase of Wanyang Zhongchuang City (Phase 1)

Construction unit: Ningbo Xuyue New Materials Technology Co., LTD.

Construction Site: No. 1-2, Building 1, Wanyang Zhongchuang City, Beilun (Baifeng), Ningbo

Construction content: An annual output of 2000 tons of modified plastic particles

Major environmental measures:

(1) Wastewater treatment measures: The project will implement rain and pollution diversion, and the production wastewater will be discharged after treatment by sewage treatment facilities; Domestic sewage is discharged according to the standard after pretreatment by septic tank.

(2) Waste gas treatment measures: the hot melt extrusion waste gas of this project is collected by the gas collection hood, treated by a set of water spray + activated carbon device (TA003), and discharged through a 25m high exhaust cylinder (DA001) (and Ningbo Yizhu Shimming Health Technology Co., LTD., the extrusion and pouring exhaust gas exhaust gas share the same exhaust cylinder); The mixing machine shall be covered to prevent dust from escaping, and the mechanical ventilation measures of the workshop shall be strengthened. The entrance of the crusher is covered by a soft curtain, and the mechanical ventilation measures of the workshop are strengthened.

(3) Noise prevention measures: The main noise source of this project is the noise generated during the operation of various types of equipment. In order to ensure the standard discharge of factory boundary noise, the plant is rationally arranged and low noise equipment is selected to control the noise.

(4) Solid waste treatment measures: Scraps and unqualified products generated by this project are not solid waste after collection and crushing for reuse; The spray waste liquid and waste activated carbon were collected and entrusted to Ningbo Chitong Grease Co., LTD. Beilun branch for disposal; After collection and temporary storage for shelter, the household garbage shall be entrusted to the sanitation department for regular transportation.

Publicity period: March 8, 2024 - April 7, 2024 (20 working days)

The public can log on to http://www.meijiuwang.com.cn/ to check the investigation report and acceptance opinions of the project. If the public has comments and suggestions on the construction project, it can be reflected to the construction unit within the publicity period, and please leave contact information (name, address, telephone or email) to reflect the problem in order to get timely feedback.

Name of construction unit: Ningbo Xuyue New Materials Technology Co., LTD.

Contact: Mr. Xing

Tel: 13352370420


Attachment:

Xuyue new material acceptance report.pdf


Ningbo Xuyue New Materials Technology Co., LTD.

March 8, 2024

Responsive image
首頁  |  關(guān)于我們  |  產(chǎn)品中心  |  應(yīng)用領(lǐng)域  |  新聞中心  |  人力資源  |  聯(lián)系我們
  • Responsive image
  • Responsive image

    地址

    浙江省寧波市北侖區(qū)白峰街道強(qiáng)峰路36號
  • Responsive image
  • Responsive image

    關(guān)注我們

  • 马山县| 湟源县| 小金县| 张家界市| 凤庆县| 临颍县| 林周县| 安新县| 翁牛特旗| 德州市| 石阡县| 蒙自县| 台北市| 磐安县| 宁远县| 渑池县| 嘉善县| 固安县| 中西区| 津市市| 夏河县| 盖州市| 华宁县| 镇赉县| 西畴县| 鄂托克旗| 万载县| 衡南县| 夏津县| 仪陇县| 安仁县| 成武县| 闸北区| 保亭| 双流县| 石城县| 舒兰市| 原平市| 兴城市| 古交市| 沽源县|